Butler bridges closing for Sullivan Run flood control project
Butler City is closing two bridges over Sullivan Run to prepare for the Sullivan flood control project.
The West Penn Street bridge over the creek will be closed Monday, and the Miller Avenue bridge will close March 7. The streets will reopen in the late summer when the project is complete.