Site last updated: Wednesday, November 25, 2026

Log In

Reset Password
Butler County's great daily newspaper

Evening rolling closures announced on Route 422 for Shearer Bridge project

PennDOT has announced rolling closures Oct. 6 and Oct. 14 on Route 422 West, and on Oct. 19 on Route 422 East, related to work on the Shearer Bridge in Butler and Summit townships.

Rolling closures will occur from 7 to 9 p.m. in 15-minute intervals.

For Route 422 West, the rolling closures will be at the Route 422 West on-ramp from the interchange with Routes 38 and 68. A crash truck will be stopping all traffic to initiate the closures about 1.5 miles prior to the Mitchell Hill Road on-ramp.

For the Route 422 East rolling closure, a crash truck will be stopping all traffic to initiate the closure about one mile before the Route 8 interchange. Alternative dates for construction are scheduled the following day if construction is not completed.

Mekis Construction, of Fenelton, is estimated to complete the $6.2 million bridge rehabilitation project in December 2026.

More in Local News

Subscribe to our Daily Newsletter

* indicates required
TODAY'S PHOTOS