Site last updated: Sunday, November 22, 2026

Log In

Reset Password
Butler County's great daily newspaper

Freeport OKs middle school project details

Building slated to open in 2015

BUFFALO TWP — The Freeport School District is a step closer to the September 2015 opening of its new $31 million, 100,000-square-foot middle school on its Buffalo Township campus.

The school board on Wednesday approved four measures for the building project.

“We’re moving forward, and we’re right on schedule,” said Dan Lucovich, board president. “We feel good about it.”

First, the board approved the $23.4 million maximum building construction cost, which includes labor and materials. In the same vote, the board approved the school’s design development, which is preliminary drawings that specify materials and the placement of projectors, blackboards and other built-ins such as cabinets and cupboards, said project architect J. Greer Hayden of HHSDR Architects and Engineers, Pittsburgh.

In a second motion, the board approved Geo-Mechanics of Elizabeth to drill and analyze site test borings for $39,495. Geo-Mechanics will drill six-inch deep holes to collect soil samples for analysis, Hayden said.

Once the soil composition is known, the architect can choose a suitable foundation system.

In the third motion, the board approved Mercyhurst Archaeological Institute of Erie to survey the site. The state Bureau of Historical Preservation requires the survey because the high school is more than 50 years old, Hayden said.

Archeologists will dig down about 18 inches for artifacts that might reveal some of the site’s history.

“We don’t really anticipate anything,” Hayden said, but there might be a Native American burial site or campsite relics leftover from the 1800s.

Board members suggested that students be allowed to observe the dig.

Fourth, the school board approved Dave E. Woorster and Associates of Pittsburgh to do a traffic assessment required by the state Department of Transportation for $1,400. Woorster is using data it already has on traffic patterns to develop the report.

Hayden said school dismissal times are the peak traffic periods at the campus. Arrival times are not an issue, he said.

In addition, a district committee has met with Freeport officials to discuss the future of the junior high school and the kindergarten center, which will close once the middle school opens. The elementary schools will house kindergarten through fifth grades, the middle school will house sixth through eighth grades, and the high school will house ninth through 12th grades.

The board’s athletic committee also is meeting with borough officials to discuss the Swartz field lease.

The district’s lease for the James E. Swartz Sr. Memorial Field is up in June 2015.

“We don’t see keeping a building open just for locker rooms,” said Frank Borelli, board member. Sports teams use the junior high school locker rooms adjacent to the field.

Borelli said there also are electrical, seating and parking issues with the field.

School property taxes are expected to go up 8.45 mills over three years to pay for the middle school, and the district could incur other millage increases at the same time.

The district’s millage rate is at 122.1 mills for Buffalo Township property owners, and 52.7 mills for Armstrong County residents. The value of 1 mill in Buffalo Township is about $20. The value of 1 mill in Armstrong County is about $31.

More in Local News

Subscribe to our Daily Newsletter

* indicates required
TODAY'S PHOTOS